Final | 8/8/2002 | 8/8/2002 | 8/8/2002 | P | PASS |
Dixie Fellows
|
|
|
###-####
|
Rough-in | 6/20/2002 | 6/20/2002 | 6/20/2002 | P | PART |
Alan Hauser
|
|
|
cover inspection for conference room ###-####fan in ok for cover, only room looked at 6/20/2002 3:28:19 PM
|
Rough-in | 6/14/2002 | 6/17/2002 | 6/17/2002 | A | NR |
Dixie Fellows
|
|
|
Scheduled by Inspector: 350 On 6/14/2002 2:59:33 PM
|
Rough-in | 6/17/2002 | 6/17/2002 | 6/17/2002 | P | PASS |
Dixie Fellows
|
|
|
ROBIN ###-#### ok to cover mech room 6/17/2002 5:18:32 PM
|
Rough-in | 6/14/2002 | 6/14/2002 | 6/14/2002 | P | CANC |
Alan Hauser
|
|
|
will do monday morning, robin gone and dixie, not sure what is left. talked to contractor 6/14/2002 3:00:24 PM
|
Rough-in | 6/11/2002 | 6/11/2002 | 6/11/2002 | P | PART |
Dixie Fellows
|
|
|
###-####- robin r/i ok to cover exterior walls 6/11/2002 4:33:29 PM
|
Pressure Test | 6/7/2002 | 6/7/2002 | 6/7/2002 | P | PASS |
Dixie Fellows
|
|
|
pres test ###-####- robing
|
Pressure Test | 6/4/2002 | 6/5/2002 | 6/5/2002 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/04/2002 at 20:55:37. Contact: ###-####. gas pipe to 3 furn needs to be 1" 6/5/2002 2:09:24 PM
|
Rough-in | 6/4/2002 | 6/5/2002 | 6/5/2002 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/04/2002 at 20:54:41. Contact: ###-####. ok to cover 2nd floor and attic 6/5/2002 2:09:05 PM
|
Pressure Test | 6/3/2002 | 6/4/2002 | 6/4/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/03/2002 at 17:23:59. Contact: ###-####. need btu load and gas pipe layout for job 6/4/2002 11:49:49 AM
|
Rough-in | 6/3/2002 | 6/4/2002 | 6/4/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/03/2002 at 17:23:20. Contact: ###-####. left c/n with robin for 2nd story and attic only 6/4/2002 11:49:34 AM
|