DOC - Permit Finaled | | | 12/10/2002 | | DONE |
|
|
|
|
Pressure Test | 5/29/2002 | 5/29/2002 | 5/29/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 05/29/2002 at 10:19:47. Contact: .
|
Pressure Test | 5/27/2002 | 5/28/2002 | 5/28/2002 | A | FAIL |
Alan Hauser
|
|
|
c/n posted 5/28/2002 1:52:50 PM
|
Pressure Test | 5/23/2002 | 5/24/2002 | 5/24/2002 | A | FAIL |
Alan Hauser
|
|
|
c/n at pool boiler 5/24/2002 12:10:33 PM
|