Rough-in | 5/30/2002 | 5/30/2002 | 5/30/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/30/2002 at 00:02:07. Contact: ###-####...off boise ave..past broadway 5/30/2002 8:47:24 AM
|
Rough-in | 5/23/2002 | 5/24/2002 | 5/24/2002 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/23/2002 at 14:24:07. Contact: ###-####. maintane 1 inch clearance at header from flue. 5/24/2002 10:55:05 AM
|