Final | 9/25/2002 | 9/25/2002 | 9/25/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/25/2002 at 08:33:45. Contact: ###-####.
|
Rough-in | 6/10/2002 | 6/11/2002 | 6/11/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/10/2002 at 16:44:13. Contact: ###-####.
|
Pressure Test | 6/5/2002 | 6/6/2002 | 6/6/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/05/2002 at 15:19:43. Contact: ###-####.
|
Rough-in | 6/5/2002 | 6/6/2002 | 6/6/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/05/2002 at 15:19:26. Contact: ###-####. posted corrections 6/6/2002 12:43:04 PM
|
Pressure Test | 6/3/2002 | 6/3/2002 | 6/3/2002 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/03/2002 at 08:44:35. Contact: ###-####. Called Contr. 6/3/2002 4:07:40 PM
|
Rough-in | 6/3/2002 | 6/3/2002 | 6/3/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/03/2002 at 08:44:19. Contact: ###-####.
|