Final | 8/6/2002 | 8/7/2002 | 8/7/2002 | A | PASS |
Alan Hauser
|
|
|
TODD ###-#### KEY IS ON TOP OF DOOR
|
Pressure Test | 6/4/2002 | 6/5/2002 | 6/5/2002 | A | PASS |
Alan Hauser
|
|
|
todd- ###-#### pres test test ok thru out side valve. 6/4/2002 4:04:54 PM
|
Rough-in | 6/3/2002 | 6/4/2002 | 6/4/2002 | A | PART |
Alan Hauser
|
|
|
r/i ok, need pressure test through customer shut off valve 6/4/2002 9:41:55 AM
|
Rough-in | 6/3/2002 | 6/3/2002 | 6/3/2002 | P | NR |
Dave Hannah
|
|
|
###-#### TODD
|