Final | 7/15/2002 | 7/15/2002 | 7/15/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/15/2002 at 10:54:20. Contact: ###-####.
|
Rough-in | 6/12/2002 | 6/13/2002 | 6/13/2002 | A | FAIL |
Alan Hauser
|
|
|
not ready, $42 reinspection 6/13/2002 11:37:07 AM
|
Rough-in | 6/13/2002 | 6/13/2002 | 6/13/2002 | P | PASS |
Dixie Fellows
|
|
|
|
Rough-in | 6/11/2002 | 6/12/2002 | 6/12/2002 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/11/2002 at 16:44:16. Contact: ###-####...broadway to pennsylvania 6/12/2002 8:45:19 AM... 6/12/2002 8:51:01 AM gas ok...need access to attic furn 6/12/2002 9:19:40 AM
|
Rough-in | 6/10/2002 | 6/11/2002 | 6/11/2002 | P | FAIL |
Alan Hauser
|
|
|
locked 6/11/2002 3:54:36 PM
|