Pressure Test | 6/6/2002 | 6/7/2002 | 6/7/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/06/2002 at 13:40:05. Contact: ###-####.
|
Pressure Test | 6/6/2002 | 6/6/2002 | 6/6/2002 | P | NR |
Alan Hauser
|
|
|
continue gas piping into fp box 6/6/2002 2:00:58 PM
|