Final | 6/27/2002 | 6/28/2002 | 6/28/2002 | A | PASS |
Jim Sly
|
|
|
CHAD ###-####
|
Final | 6/27/2002 | 6/28/2002 | 6/28/2002 | A | PART |
Dixie Fellows
|
|
|
CHAD ###-#### gas test ok 6/28/2002 12:33:56 PM
|
Final | 6/24/2002 | 6/25/2002 | 6/25/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/24/2002 at 16:47:31. Contact: .pressure test failed 6/25/2002 1:25:35 PM
|
Final | 6/21/2002 | 6/24/2002 | 6/24/2002 | A | FAIL |
Dixie Fellows
|
|
|
CHAD ###-#### (WESTERN HEATING REPLACED 1/4 OF GAS PIPING... DO THEY NEED PRESSURE WITNESS?)..off mcmillan before five mile..right on fieldcrest 6/24/2002 8:50:55 AM gas failed..protect gas tite at f/p jacket..talked to cory 6/24/2002 10:57:05 AM
|