Final | 12/11/2002 | 12/11/2002 | 12/11/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/11/2002 at 08:07:51. Contact: ###-####.
|
Pressure Test | 11/12/2002 | 11/12/2002 | 11/12/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/12/2002 at 08:14:20. Contact: ###-####. 60lb main to roof ok 11/12/2002 2:54:24 PM
|
Pressure Test | 10/11/2002 | 10/11/2002 | 10/11/2002 | P | PART |
Alan Hauser
|
|
|
all gas piping with in bldg. tested, 60# test and joints soaped 10/11/2002 5:31:59 PM
|