Final | 12/23/2002 | 12/24/2002 | 12/24/2002 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/23/2002 at 13:52:55. Contact: ###-####.
|
Final | 11/15/2002 | 11/18/2002 | 11/18/2002 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/15/2002 at 12:30:50. Contact: ###-####.
|
Rough-in | 7/15/2002 | 7/16/2002 | 7/16/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/15/2002 at 14:26:22. Contact: ###-####.
|
Rough-in | 6/26/2002 | 6/27/2002 | 6/27/2002 | A | PART |
Dixie Fellows
|
|
|
###-#### call first to meet there WAITING ON ENG SPEC FOR F/P 6/27/2002 1:06:04 PM
|