Final | 8/29/2002 | 8/30/2002 | 8/30/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/29/2002 at 15:55:23. Contact: ###-####.
|
Final | 8/29/2002 | 8/29/2002 | 8/29/2002 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/29/2002 at 06:59:30. Contact: ###-####. 8/29/2002 8:45:00 AM Prior c/n not on site--$42.00 re-inspection fee. 8/29/2002 8:45:35 AM
|
Final | 8/26/2002 | 8/27/2002 | 8/27/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/26/2002 at 13:48:26. Contact: ###-####.c/n on site 8/27/2002 9:51:57 AM
|
Rough-in | 7/12/2002 | 7/12/2002 | 7/12/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/12/2002 at 08:56:44. Contact: ###-####.
|