Final | 8/21/2002 | 8/21/2002 | 8/21/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/21/2002 at 09:37:39. Contact: ###-####.
|
Pressure Test | 7/9/2002 | 7/10/2002 | 7/10/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/09/2002 at 15:57:16. Contact: ###-####.
|
Rough-in | 7/9/2002 | 7/10/2002 | 7/10/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/09/2002 at 15:57:03. Contact: ###-####.
|