Final | 8/21/2002 | 8/22/2002 | 8/22/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/21/2002 at 13:15:30. Contact: ###-####.
|
Final | 8/20/2002 | 8/20/2002 | 8/20/2002 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/20/2002 at 07:45:53. Contact: ###-####.c/n posted on unit. 8/20/2002 2:09:02 PM 8/20/2002 2:09:31 PM
|
Rough-in | 7/5/2002 | 7/8/2002 | 7/8/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/05/2002 at 12:00:17. Contact: ###-####.
|
Pressure Test | 7/3/2002 | 7/5/2002 | 7/5/2002 | A | PASS |
Dixie Fellows
|
|
|
MERLE ###-####
|
Rough-in | 7/3/2002 | 7/5/2002 | 7/5/2002 | A | FAIL |
Dixie Fellows
|
|
|
MERLE ###-#### BATH EXHAUST 3' FROM WINDOW 7/5/2002 11:39:00 AM
|