Final | 9/17/2002 | 9/18/2002 | 9/18/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 09/17/2002 at 13:48:42. Contact: ###-####.
|
Pressure Test | 7/11/2002 | 7/11/2002 | 7/11/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/11/2002 at 08:47:05. Contact: ###-####. gas to back garage ok 7/11/2002 3:49:26 PM
|
Pressure Test | 7/8/2002 | 7/9/2002 | 7/9/2002 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/08/2002 at 12:01:56. Contact: ###-####. one garage test failed 7/9/2002 10:18:27 AM
|
Rough-in | 7/8/2002 | 7/9/2002 | 7/9/2002 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/08/2002 at 12:01:35. Contact: ###-####...franklin between maple grove and five mile 7/9/2002 7:32:19 AM
|