Final | 8/16/2002 | 8/19/2002 | 8/19/2002 | A | PASS |
Alan Hauser
|
|
|
Verbal re-quest between Merle TML and Alan Houser for Fri afternoon. Stan ###-####. Thanks!; Phone #: ###-####
|
Final | 8/15/2002 | 8/16/2002 | 8/16/2002 | A | FAIL |
Alan Hauser
|
|
|
no inspection on flex duct, diffuser hook up and need 10' seperation from flue at one rtu to opening into next rtu. $42 reinspection fee, no inspections till paid 8/16/2002 12:00:38 PM
|
Final | 7/26/2002 | 7/29/2002 | 7/29/2002 | A | CANC |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 07/26/2002 at 08:41:49. Contact: ###-####. amanda called to canc this inspection
|
Rough-in | 7/9/2002 | 7/9/2002 | 7/9/2002 | P | PASS |
Alan Hauser
|
|
|
no grid or diff. hook up. duct ok 7/9/2002 1:34:05 PM
|