MEC-Aging Inspection | 3/5/2003 | 3/5/2003 | 3/5/2003 | | PASS |
Dixie Fellows
|
|
|
|
Final | 9/4/2002 | 9/5/2002 | 9/5/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/04/2002 at 16:54:12. Contact: ###-####.
|
Final | 9/3/2002 | 9/4/2002 | 9/4/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/03/2002 at 14:32:23. Contact: ###-####. NO CARD ON SITE...$42.00 REINSPECTION FEE..2ND TRIP 9/4/2002 10:36:16 AM
|
Final | 8/30/2002 | 8/30/2002 | 8/30/2002 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/30/2002 at 11:08:49. Contact: ###-####. no card on site 8/30/2002 7:12:45 PM
|
Pressure Test | 7/18/2002 | 7/18/2002 | 7/18/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/18/2002 at 07:29:15. Contact: ###-####.
|
Rough-in | 7/16/2002 | 7/17/2002 | 7/17/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/16/2002 at 07:48:45. Contact: ###-####...###-#### 7/16/2002 1:07:37 PM gas test failed..need 1" clear from b-vent to flex duct 7/17/2002 9:32:38 AM
|
Pressure Test | 7/11/2002 | 7/12/2002 | 7/12/2002 | A | FAIL |
Dixie Fellows
|
|
|
JEFF ###-#### need btu of w/h to check sizing of gas tite 7/12/2002 10:47:14 AM
|
Rough-in | 7/11/2002 | 7/12/2002 | 7/12/2002 | A | FAIL |
Dixie Fellows
|
|
|
JEFF ###-#### posted corrections...called contractor 7/12/2002 10:46:58 AM
|