Final | 7/24/2002 | 7/24/2002 | 7/24/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/24/2002 at 08:37:33. Contact: ###-####.
|
Final | 7/19/2002 | 7/22/2002 | 7/22/2002 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/19/2002 at 09:17:40. Contact: ###-####. Scheduled by a wip frn in crawl space / watch out for water in scontractor via pace. Hello! on 07/19/2002 at 09:17:40. Contact: ###-####. 7/22/2002 4:03:48 PM
|
Pressure Test | 7/22/2002 | 7/22/2002 | 7/22/2002 | P | PASS |
Jim Storey
|
|
|
|