Final | 7/25/2002 | 7/26/2002 | 7/26/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/25/2002 at 15:14:56. Contact: ###-####.
|
Final | 7/24/2002 | 7/25/2002 | 7/25/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/24/2002 at 13:09:01. Contact: ###-####. gas failed..42.00 fee 7/25/2002 9:39:20 AM
|
Pressure Test | 7/22/2002 | 7/23/2002 | 7/23/2002 | A | FAIL |
Dixie Fellows
|
|
|
###-#### leak 7/23/2002 10:01:45 AM
|