Final | 9/26/2002 | 9/26/2002 | 9/26/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/26/2002 at 11:02:30. Contact: ###-####.
|
Pressure Test | 8/12/2002 | 8/13/2002 | 8/13/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/12/2002 at 13:06:53. Contact: ###-####. gas to range ok 8/13/2002 10:24:49 AM
|
Rough-in | 8/5/2002 | 8/5/2002 | 8/5/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/05/2002 at 10:01:15. Contact: ###-####.
|
Pressure Test | 8/1/2002 | 8/1/2002 | 8/1/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/01/2002 at 10:11:23. Contact: ###-####.
|
Rough-in | 8/1/2002 | 8/1/2002 | 8/1/2002 | P | FAIL |
Alan Hauser
|
|
|
finish framing at 2nd floor b-vent in closet 8/1/2002 3:02:02 PM
|