Final | 10/14/2002 | 10/15/2002 | 10/15/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/14/2002 at 14:26:03. Contact: ###-####.
|
Final | 10/2/2002 | 10/3/2002 | 10/3/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/02/2002 at 16:35:50. Contact: ###-####.needs gaurd post in front of furnace 10/3/2002 11:30:22 AM
|
Rough-in | 7/30/2002 | 7/30/2002 | 7/30/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 07/30/2002 at 09:02:19. Contact: ###-####.
|