Final | 12/3/2002 | 12/3/2002 | 12/3/2002 | P | PASS |
Alan Hauser
|
|
|
f/p sharon---- ###-####
|
Rough-in | 8/28/2002 | 8/29/2002 | 8/29/2002 | A | DONE |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/28/2002 at 13:42:40. Contact: ###-####.
|
Pressure Test | 8/26/2002 | 8/27/2002 | 8/27/2002 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/26/2002 at 17:33:54. Contact: ###-####.
|
Rough-in | 8/6/2002 | 8/7/2002 | 8/7/2002 | A | PASS |
Dixie Fellows
|
|
|
CHRIS ###-####
|
Rough-in | 7/29/2002 | 7/30/2002 | 7/30/2002 | A | FAIL |
Alan Hauser
|
|
|
$42 reinspection, c/n posted 7/30/2002 11:10:34 AM
|
Rough-in | 7/26/2002 | 7/26/2002 | 7/26/2002 | P | NH |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/26/2002 at 11:16:55. Contact: ###-####. left notice 7/26/2002 3:41:35 PM
|
Final | 7/24/2002 | 7/25/2002 | 7/25/2002 | A | NR |
Alan Hauser
|
|
|
7/25/2002 11:56:07 AM called contractor 7/25/2002 11:56:19 AM
|