Final | 8/26/2002 | 8/27/2002 | 8/27/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/26/2002 at 13:38:33. Contact: ###-####.
|
Final | 7/26/2002 | 7/29/2002 | 7/29/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/26/2002 at 10:00:54. Contact: ###-####. Ruogh in only....OK 7/29/2002 12:52:27 PM
|
Final | 7/24/2002 | 7/25/2002 | 7/25/2002 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/24/2002 at 15:40:22. Contact: ###-####.
|
Rough-in | 7/25/2002 | 7/25/2002 | 7/25/2002 | A | PASS |
Dave Hannah
|
|
|
|