Final | 10/11/2002 | 10/11/2002 | 10/11/2002 | P | PASS |
Steven Webb
|
|
|
###-####
|
Rough-in | 8/6/2002 | 8/6/2002 | 8/6/2002 | P | PASS |
Alan Hauser
|
|
|
randy; Phone #: ###-####
|
Rough-in | 8/2/2002 | 8/2/2002 | 8/2/2002 | P | FAIL |
Steven Webb
|
|
|
RANDY; Phone #: ###-#### C/N--Also verbally informed builder and mech. contractor what needed to be done. $42.00 re-inspection fee issued. 8/2/2002 2:33:19 PM
|
Rough-in | 7/31/2002 | 8/1/2002 | 8/1/2002 | A | FAIL |
Alan Hauser
|
|
|
c/n posted at front window on inside 8/1/2002 12:04:25 PM
|
Pressure Test | 7/30/2002 | 7/31/2002 | 7/31/2002 | A | NR |
Alan Hauser
|
|
|
; Phone #: ###-####
|
Rough-in | 7/30/2002 | 7/31/2002 | 7/31/2002 | A | NR |
Alan Hauser
|
|
|
2nd trip, $42 reinspection, no inspections till paid 7/31/2002 12:08:18 PM
|
Pressure Test | 7/26/2002 | 7/26/2002 | 7/26/2002 | P | NR |
Alan Hauser
|
|
|
RANDY ###-#### PLEASE CALL BEFORE GOING OUT
|
Rough-in | 7/26/2002 | 7/26/2002 | 7/26/2002 | P | NR |
Alan Hauser
|
|
|
RANDY ###-#### PLEASE CALL BEFORE GOING OUT
|