Final | 10/10/2002 | 10/10/2002 | 10/10/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/10/2002 at 08:18:27. Contact: ###-####.
|
Final | 10/2/2002 | 10/2/2002 | 10/2/2002 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/02/2002 at 07:22:38. Contact: ###-####...after lorinda 10/2/2002 12:21:01 PM support gas pipe at outside foundation 10/2/2002 4:50:54 PM
|
Rough-in | 8/1/2002 | 8/1/2002 | 8/1/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/01/2002 at 11:23:36. Contact: ###-####.
|
Rough-in | 7/26/2002 | 7/29/2002 | 7/29/2002 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/26/2002 at 15:51:08. Contact: ###-####. need comb air...gas ok 7/29/2002 2:01:57 PM
|