Rough-in | 9/10/2002 | 9/11/2002 | 9/11/2002 | A | FAIL |
Dave Hannah
|
|
|
STEVE ###-#### KEY IS ON TOP OF THE BREAKER BOX HANGING ON A NAIL c/n items not completed pressure test stillbelow 20psi failed 9/11/2002 9:29:47 AM
|
Final | 9/9/2002 | 9/9/2002 | 9/9/2002 | P | NH |
Tom Arcoraci
|
|
|
###-#### no access called no ans 9/9/2002 3:58:50 PM
|
Pressure Test | 8/27/2002 | 8/28/2002 | 8/28/2002 | A | FAIL |
Alan Hauser
|
|
|
|
Rough-in | 8/27/2002 | 8/28/2002 | 8/28/2002 | A | FAIL |
Alan Hauser
|
|
|
key is above breaker box in garage ###-#### corrections not finished$42 reinspection 8/28/2002 11:02:26 AM
|
Pressure Test | 8/8/2002 | 8/9/2002 | 8/9/2002 | A | FAIL |
Alan Hauser
|
|
|
c/n posted 8/9/2002 12:48:28 PM
|
Rough-in | 8/8/2002 | 8/9/2002 | 8/9/2002 | A | FAIL |
Alan Hauser
|
|
|
c/n posted 8/9/2002 12:48:12 PM
|
Rough-in | 8/8/2002 | 8/8/2002 | 8/8/2002 | P | FAIL |
Alan Hauser
|
|
|
was told house would be open, arrived at 2:25 pm and locked, no inspections till $42 paid 8/8/2002 3:03:35 PM
|
Rough-in | 8/6/2002 | 8/7/2002 | 8/7/2002 | P | FAIL |
Alan Hauser
|
|
|
locked 8/7/2002 3:17:20 PM
|
Rough-in | 7/26/2002 | 7/29/2002 | 7/29/2002 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/26/2002 at 14:33:05. Contact: ###-####.
|