Final | 11/11/2002 | 11/12/2002 | 11/12/2002 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Trina Stracener
|
Pressure Test | 8/29/2002 | 8/30/2002 | 8/30/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/29/2002 at 15:19:18. Contact: ###-####. New line to Range. 8/30/2002 11:53:07 AM
|
Rough-in | 8/5/2002 | 8/5/2002 | 8/5/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/05/2002 at 09:07:24. Contact: ###-####. Previously passed by 350/411. 8/5/2002 2:16:28 PM
|
Pressure Test | 8/1/2002 | 8/1/2002 | 8/1/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/01/2002 at 11:08:01. Contact: ###-####.
|
Rough-in | 7/30/2002 | 7/31/2002 | 7/31/2002 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/30/2002 at 16:12:40. Contact: ###-####. cancelled by monty 7/31/2002 12:23:58 PM
|
Rough-in | 7/30/2002 | 7/30/2002 | 7/30/2002 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/30/2002 at 08:57:17. Contact: ###-####. gas pipe undersized 7/30/2002 4:59:25 PM
|
Rough-in | 7/26/2002 | 7/29/2002 | 7/29/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/26/2002 at 14:49:36. Contact: ###-####. need equipment btu load...need specs on f/p 7/29/2002 2:51:34 PM
|