Final | 9/13/2002 | 9/13/2002 | 9/13/2002 | P | PASS |
Jim Sly
|
|
|
CALL CHRIS IF YOU HAVE ANY QUESTIONS ###-####; Phone #: ###-#### Internet Inspection Request from: Michelle Evans Gas test OK. 9/13/2002 3:32:23 PM
|
Final | 8/2/2002 | 8/2/2002 | 8/2/2002 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/02/2002 at 10:40:16. Contact: ###-####.Call for access ###-####
|
Pressure Test | 8/2/2002 | 8/2/2002 | 8/2/2002 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/02/2002 at 10:40:26. Contact: ###-####.
owner took off the bbq to be in compliance w/ gas line size 8/2/2002 3:06:19 PM
|
Rough-in | 7/31/2002 | 7/31/2002 | 7/31/2002 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/31/2002 at 08:24:51. Contact: ###-####...off collister 7/31/2002 12:26:00 PM
|
Rough-in | 7/31/2002 | 7/31/2002 | 7/31/2002 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/31/2002 at 08:24:51. Contact: ###-####...off collister 7/31/2002 12:26:00 PM gas pipe undersized...r/i ok 7/31/2002 5:26:35 PM
|