Final | 2/18/2003 | 2/18/2003 | 2/18/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 2/18/2003 at 10:03:21 AM. Contact: (208) . ###-#### call 1/2 hour prior for access
|
Final | 2/18/2003 | 2/18/2003 | 2/18/2003 | P | NH |
Alan Hauser
|
|
|
|
Final | 2/18/2003 | 2/18/2003 | 2/18/2003 | P | PASS |
Alan Hauser
|
|
|
ALAN,THIS IS THE ONE THAT YOU WANTED CALLED BACK IN...DARLA duct ok 2/19/2003 12:24:41 AM
|
Conference | 9/26/2002 | 9/27/2002 | 9/27/2002 | A | PASS |
Alan Hauser
|
|
|
meet with plbg. about water heater, need imformation on venting from manufacture, before installation 9/27/2002 1:33:28 PM
|
Pressure Test | 8/28/2002 | 8/29/2002 | 8/29/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/28/2002 at 13:49:32. Contact: ###-####.
|
Rough-in | 8/28/2002 | 8/29/2002 | 8/29/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/28/2002 at 13:49:12. Contact: ###-####.
|