Final | 2/14/2003 | 2/14/2003 | 2/14/2003 | A | PASS |
Dave Hannah
|
|
|
|
Final | 2/12/2003 | 2/12/2003 | 2/12/2003 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/12/2003 at 06:55:23. Contact: ###-####. talked with home owener about range hood clearances 2/12/2003 9:49:21 AM
|
Rough-in | 10/28/2002 | 10/29/2002 | 10/29/2002 | A | PASS |
Dave Hannah
|
|
|
###-#### c/n item completed 10/29/2002 9:11:09 AM
|
Rough-in | 10/28/2002 | 10/28/2002 | 10/28/2002 | P | FAIL |
Russ Owen
|
|
|
fn insp--curtis ###-#### . c/n seal fire stop spacer. 10/28/2002 2:04:51 PM
|
Rough-in | 10/23/2002 | 10/24/2002 | 10/24/2002 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### cn incomplete from before 10/24/2002 2:29:16 PM
|
Rough-in | 10/15/2002 | 10/16/2002 | 10/16/2002 | A | FAIL |
Alan Hauser
|
|
|
2" clearance at flue, wrong fire stop used 10/16/2002 2:49:12 PM
|
Rough-in | 8/21/2002 | 8/21/2002 | 8/21/2002 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/21/2002 at 09:41:02. Contact: ###-####. C/N--Clearance to comb. not meet rear of fireplace--completed roof r.i. 8/21/2002 1:49:32 PM
|