Final | 11/6/2002 | 11/7/2002 | 11/7/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/06/2002 at 17:36:02. Contact: ###-####.
|
Final | 11/5/2002 | 11/6/2002 | 11/6/2002 | A | NH |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/05/2002 at 12:32:09. Contact: ###-####.
|
Rough-in | 8/20/2002 | 8/21/2002 | 8/21/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/20/2002 at 14:29:48. Contact: ###-####. P. T.--OK 8/21/2002 11:25:53 AM
|
Rough-in | 8/15/2002 | 8/16/2002 | 8/16/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/15/2002 at 16:15:26. Contact: ###-####. r.i--ok--pressure test failed--correct and re-call. 8/16/2002 9:28:32 AM
|