Rough-in | 8/8/2002 | 8/8/2002 | 8/8/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/08/2002 at 08:45:32. Contact: ###-####. Final OK. 8/8/2002 12:36:50 PM
|
Rough-in | 8/6/2002 | 8/6/2002 | 8/6/2002 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/06/2002 at 09:34:25. Contact: ###-####.
|