Final | 10/8/2003 | 10/8/2003 | 10/8/2003 | A | PASS |
Dixie Fellows
|
|
|
just needs final/doc final thanks darla
|
Final | 12/4/2002 | 12/5/2002 | 12/5/2002 | A | FAIL |
Dixie Fellows
|
|
|
kim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie f/p not permitted...inspected ??? 12/5/2002 9:24:08 AM
|
Rough-in | 8/7/2002 | 8/7/2002 | 8/7/2002 | P | PASS |
Dixie Fellows
|
|
|
KIM THIS IS FOR A (PARTIAL PER DIXIE); Phone #: ###-####
|
Pressure Test | 8/5/2002 | 8/6/2002 | 8/6/2002 | P | PASS |
Dixie Fellows
|
|
|
KIM ###-#### sized ok and holding 8/6/2002 3:32:59 PM
|
Rough-in | 8/5/2002 | 8/6/2002 | 8/6/2002 | P | NR |
Dixie Fellows
|
|
|
KIM ###-####..mcmillan..left on farrow..left on hickory 8/6/2002 1:21:32 PM
|