Final | 5/9/2003 | 5/9/2003 | 5/9/2003 | P | PASS |
Dixie Fellows
|
|
|
###-####
|
Pressure Test | 3/17/2003 | 3/17/2003 | 3/17/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/17/2003 at 8:45:44 AM. Contact: ###-####....###-####..terry 3/17/2003 1:13:54 PM 60lb main into and on top of building ok..gas down to w/h and furn inside bldg ok 3/17/2003 5:36:50 PM
|
Pressure Test | 8/13/2002 | 8/14/2002 | 8/14/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/13/2002 at 16:00:33. Contact: ###-####.60 psi test. 8/14/2002 10:15:13 AM
|
Pressure Test | 8/12/2002 | 8/13/2002 | 8/13/2002 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/12/2002 at 15:43:27. Contact: ###-####...past mitchell...gas only 8/13/2002 12:49:32 PM
|