Final | 12/30/2002 | 12/30/2002 | 12/30/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/30/2002 at 11:19:43. Contact: ###-####. LOCK BOX CODE # 10956 THIS IS OUT IN GARAGE BY FURNACE
|
Final | 12/16/2002 | 12/17/2002 | 12/17/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/16/2002 at 13:56:00. Contact: ###-####.---for access 2468enter c/n items not completed 42 $ reinspection fee 12/17/2002 9:29:17 AM
|
Final | 10/14/2002 | 10/14/2002 | 10/14/2002 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/14/2002 at 08:27:58. Contact: ###-####. C/N posted 10/14/2002 2:43:50 PM
|
Pressure Test | 8/22/2002 | 8/23/2002 | 8/23/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/22/2002 at 12:02:42. Contact: ###-####.
|
Rough-in | 8/22/2002 | 8/23/2002 | 8/23/2002 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/22/2002 at 12:02:22. Contact: ###-####.kitchen duct not instaled and all floor boots for supply not in place for under floor insp. 8/23/2002 11:34:10 AM
|