Final | 9/5/2002 | 9/5/2002 | 9/5/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/05/2002 at 08:39:44. Contact: ###-####...maple grove before overland 9/5/2002 12:06:15 PM
|
Final | 8/29/2002 | 8/29/2002 | 8/29/2002 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/29/2002 at 07:58:46. Contact: ###-####.c/n posted for vent termination and 90 at intake as required by instalation book. 8/29/2002 4:47:40 PM
|