Final | 11/26/2002 | 11/27/2002 | 11/27/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/26/2002 at 15:36:06. Contact: ...roosevelt..right on kootenai 11/27/2002 7:50:35 AM
|
Final | 11/25/2002 | 11/26/2002 | 11/26/2002 | A | FAIL |
Alan Hauser
|
|
|
c/n posted at water heater 11/26/2002 4:50:35 PM
|
Final | 11/26/2002 | 11/26/2002 | 11/26/2002 | P | FAIL |
Alan Hauser
|
|
|
|
Pressure Test | 10/22/2002 | 10/22/2002 | 10/22/2002 | P | PASS |
Dave Hannah
|
|
|
stacy- ###-####
|
Rough-in | 8/21/2002 | 8/21/2002 | 8/21/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/21/2002 at 08:24:40. Contact: ###-####.
|