Final | 2/26/2003 | 2/26/2003 | 2/26/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/26/2003 at 7:51:16 AM. Contact: ###-####.
|
Final | 2/21/2003 | 2/21/2003 | 2/21/2003 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/21/2003 at 10:42:39 AM. Contact: ###-####. POSTED CORRECTIONS 2/21/2003 4:08:02 PM
|
Pressure Test | 9/17/2002 | 9/17/2002 | 9/17/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/17/2002 at 09:24:50. Contact: ###-####.
|
Pressure Test | 8/28/2002 | 8/29/2002 | 8/29/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/28/2002 at 13:44:44. Contact: ###-#### 10am Matt gas pipe undersized 8/29/2002 9:34:58 AM
|
Rough-in | 8/28/2002 | 8/29/2002 | 8/29/2002 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/28/2002 at 13:44:03. Contact: ###-#### 10am Matt met with cont..posted corrections..ok to cover the floors 8/29/2002 9:37:51 AM
|
Pressure Test | 8/27/2002 | 8/28/2002 | 8/28/2002 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/27/2002 at 09:58:02. Contact: ###-####.
|
Rough-in | 8/27/2002 | 8/28/2002 | 8/28/2002 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/27/2002 at 09:57:37. Contact: ###-####...will meet cont thurs am to discuss issues 8/28/2002 1:47:24 PM
|
Rough-in | 8/22/2002 | 8/23/2002 | 8/23/2002 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/22/2002 at 17:27:39. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 08/23/2002 at 09:56:15.
|
Rough-in | 8/20/2002 | 8/22/2002 | 8/22/2002 | A | FAIL |
Alan Hauser
|
|
|
left c/n and talked with contractor 8/22/2002 11:19:53 AM
|