Final | 10/15/2002 | 10/15/2002 | 10/15/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/15/2002 at 09:27:11. Contact: ###-####.
|
Final | 10/2/2002 | 10/2/2002 | 10/2/2002 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/02/2002 at 09:08:35. Contact: ...dale..###-#### 10/2/2002 12:16:41 PM ok to cover ceiling 10/3/2002 10:05:16 AM
|
Final | 10/2/2002 | 10/2/2002 | 10/2/2002 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/02/2002 at 09:08:35. Contact: ...dale..###-#### 10/2/2002 12:16:41 PM ok to cover ceiling 10/3/2002 10:05:16 AM
|
Rough-in | 8/21/2002 | 8/22/2002 | 8/22/2002 | A | PART |
Dixie Fellows
|
|
|
grease duct ok..ok to cover ceilings 8/22/2002 8:37:09 AM
|
Rough-in | 8/21/2002 | 8/21/2002 | 8/21/2002 | P | CANC |
Russ Owen
|
|
|
transfered to 411, but will not send. 8/21/2002 3:25:47 PM
|