Final | 11/29/2002 | 12/2/2002 | 12/2/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/29/2002 at 16:22:55. Contact: ###-####.
|
Pressure Test | 9/10/2002 | 9/11/2002 | 9/11/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/10/2002 at 17:03:33. Contact: ###-####.
|
Rough-in | 9/10/2002 | 9/11/2002 | 9/11/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/10/2002 at 17:03:11. Contact: ###-####. P/T OK 9/11/2002 11:41:57 AM
|
Pressure Test | 9/6/2002 | 9/9/2002 | 9/9/2002 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen GUAGE ON 15LBS 9/9/2002 1:07:36 PM
|
Rough-in | 9/6/2002 | 9/9/2002 | 9/9/2002 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen SEAL R/A PLENUM DOWNSTAIRS FROM ELEC 9/9/2002 1:07:18 PM
|