Final | 9/20/2002 | 9/20/2002 | 9/20/2002 | P | PASS |
Dixie Fellows
|
|
|
NANCY-CALL 1ST BEFORE INSP FOR ACCESS; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Pressure Test | 9/20/2002 | 9/20/2002 | 9/20/2002 | P | PASS |
Dixie Fellows
|
|
|
NANCY-CALL 1ST BEFORE INSP FOR ACCESS; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Final | 9/3/2002 | 9/5/2002 | 9/5/2002 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/03/2002 at 15:54:56. Contact: ###-####. No access. 9/5/2002 1:47:35 PM
|
Pressure Test | 9/3/2002 | 9/5/2002 | 9/5/2002 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/03/2002 at 15:54:34. Contact: ###-####. NO acccess. 9/5/2002 1:47:20 PM
|