Final | 9/12/2002 | 9/13/2002 | 9/13/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/12/2002 at 17:51:14. Contact: ###-####.
|
Final | 9/6/2002 | 9/6/2002 | 9/6/2002 | P | FAIL |
Dixie Fellows
|
|
|
gregg; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie need 9/6/2002 1:35:46 PM need fresh air to rtu 9/6/2002 1:36:08 PM
|
Rough-in | 9/4/2002 | 9/5/2002 | 9/5/2002 | A | FAIL |
Dixie Fellows
|
|
|
greg- ###-#### doors locked 9/5/2002 11:57:47 AM
|