DOC - Permit Finaled | | | 4/3/2003 | | DONE |
|
|
|
Did not install fireplace, did gas line only
|
Final | 9/11/2002 | 9/11/2002 | 9/11/2002 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/11/2002 at 09:45:27. Contact: ###-####.
|
Pressure Test | 9/11/2002 | 9/11/2002 | 9/11/2002 | P | PASS |
Dave Hannah
|
|
|
|
Pressure Test | 9/10/2002 | 9/10/2002 | 9/10/2002 | P | FAIL |
Dave Hannah
|
|
|
###-####need to test to customer turn off valve 9/10/2002 2:15:30 PM
|