Final | 10/16/2002 | 10/17/2002 | 10/17/2002 | A | NR |
Dixie Fellows
|
|
|
###-#### no access to roof hatch...will reschedule 10/17/2002 11:39:52 AM
|
Final | 10/17/2002 | 10/17/2002 | 10/17/2002 | P | PASS |
Dixie Fellows
|
|
|
###-####
|
Final | 10/15/2002 | 10/16/2002 | 10/16/2002 | A | FAIL |
Dixie Fellows
|
|
|
###-#### gas pipe undersized...talked to cont..need full 1" from the regulator 10/16/2002 1:45:47 PM
|
Final | 9/27/2002 | 9/30/2002 | 9/30/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 15:22:00. Contact: ###-####. still need f/a at equip..waiting on info from eng. on regs..temp occ ok 9/30/2002 1:15:45 PM
|
Final | 9/26/2002 | 9/27/2002 | 9/27/2002 | P | FAIL |
Alan Hauser
|
|
|
c/n at front door 9/27/2002 7:21:36 PM
|
Pressure Test | 9/11/2002 | 9/12/2002 | 9/12/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/11/2002 at 15:21:50. Contact: ###-####. pt pass support pipe at top of vert run in elec room 9/12/2002 10:49:51 AM
|
Pressure Test | 9/11/2002 | 9/11/2002 | 9/11/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/11/2002 at 10:28:55. Contact: ###-####.
|