Final | 11/5/2002 | 11/6/2002 | 11/6/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/05/2002 at 13:29:05. Contact: ###-####. key code 193
|
Rough-in | 9/25/2002 | 9/25/2002 | 9/25/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/25/2002 at 09:55:19. Contact: ###-####.
|
Pressure Test | 9/24/2002 | 9/24/2002 | 9/24/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/24/2002 at 10:16:49. Contact: ###-####.
|
Rough-in | 9/24/2002 | 9/24/2002 | 9/24/2002 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/24/2002 at 10:16:03. Contact: ###-####. C/N posted 9/24/2002 4:12:13 PM
|