Final | 11/1/2002 | 11/4/2002 | 11/4/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/01/2002 at 16:59:42. Contact: ###-####.
|
Final | 10/28/2002 | 10/29/2002 | 10/29/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/28/2002 at 12:38:09. Contact: ###-####.need to install range hood and gas range 10/29/2002 8:59:10 AM
|
Rough-in | 9/24/2002 | 9/25/2002 | 9/25/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/24/2002 at 17:00:36. Contact: ###-####.
|
Rough-in | 9/24/2002 | 9/24/2002 | 9/24/2002 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/24/2002 at 10:04:56. Contact: ###-####. C/N posted--pressure test ok 9/24/2002 1:40:00 PM
|