Final | 1/28/2003 | 1/29/2003 | 1/29/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/28/2003 at 16:32:54. Contact: ###-####.
|
Final | 1/28/2003 | 1/28/2003 | 1/28/2003 | P | FAIL |
Alan Hauser
|
|
|
c/n at furnace 1/28/2003 11:15:14 PM
|
Pressure Test | 10/16/2002 | 10/16/2002 | 10/16/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/16/2002 at 09:34:25. Contact: ###-####.c/n made ok. 10/16/2002 12:36:57 PM
|
Pressure Test | 10/14/2002 | 10/15/2002 | 10/15/2002 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/14/2002 at 14:20:20. Contact: ###-####.Failed 2nd time--16 lbs on guage--$42.00 re-inspection fee -- to be billed to contractor. 10/15/2002 9:00:19 AM
|
Pressure Test | 10/10/2002 | 10/11/2002 | 10/11/2002 | A | FAIL |
Steven Webb
|
|
|
###-#### C/N posted--only 15 lbs on guage. 10/11/2002 9:07:18 AM
|
Rough-in | 10/10/2002 | 10/11/2002 | 10/11/2002 | A | PASS |
Steven Webb
|
|
|
###-####
|