Final | 11/7/2002 | 11/8/2002 | 11/8/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/07/2002 at 14:53:10. Contact: ###-####.key is in elect. box by front door
|
Final | 11/7/2002 | 11/7/2002 | 11/7/2002 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/07/2002 at 10:41:54. Contact: ###-####. key is elec outlet by front door C/N on site. 11/7/2002 2:27:24 PM
|
Pressure Test | 10/7/2002 | 10/7/2002 | 10/7/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/07/2002 at 09:22:16. Contact: ###-####.
|
Rough-in | 10/7/2002 | 10/7/2002 | 10/7/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/07/2002 at 09:21:51. Contact: ###-####.
|