Final | 12/19/2002 | 12/20/2002 | 12/20/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/19/2002 at 15:41:53. Contact: ###-####.
|
Rough-in | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/01/2002 at 10:04:05. Contact: ###-####.
|
Pressure Test | 10/30/2002 | 10/31/2002 | 10/31/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/30/2002 at 16:20:20. Contact: ###-####.
|
Rough-in | 10/30/2002 | 10/31/2002 | 10/31/2002 | A | FAIL |
Alan Hauser
|
|
|
c/n posted at front window 10/31/2002 2:38:55 PM
|