Rough-in | 10/9/2002 | 10/10/2002 | 10/10/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/09/2002 at 12:51:41. Contact: ###-####.
|
Rough-in | 10/4/2002 | 10/7/2002 | 10/7/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/04/2002 at 15:45:55. Contact: ###-####. covered with sheet rock 10/7/2002 11:31:26 AM
|
Rough-in | 10/7/2002 | 10/7/2002 | 10/7/2002 | P | FAIL |
Dixie Fellows
|
|
|
###-####
|
Rough-in | 9/25/2002 | 9/27/2002 | 9/27/2002 | A | NR |
Russ Owen
|
|
|
Work not complete. Note: Section 116.6 of the 1997 UMC. A reinspection fee may be assessed , for each inspection or reinspection when such portion of work for which inspection is requested is not complete. 9/27/2002 11:06:37 AM
|