Final | 11/18/2002 | 11/19/2002 | 11/19/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/18/2002 at 20:16:48. Contact: ###-####.
|
Final | 11/17/2002 | 11/18/2002 | 11/18/2002 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/17/2002 at 09:49:07. Contact: ###-####. needs hard pipe for comb air per chap 7 mec 11/18/2002 10:22:08 AM
|
Final | 11/14/2002 | 11/15/2002 | 11/15/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/14/2002 at 23:30:07. Contact: ###-####...orchard..right on malad 11/15/2002 8:27:03 AM need upper comb air 11/15/2002 10:50:42 AM
|
Pressure Test | 10/3/2002 | 10/4/2002 | 10/4/2002 | A | PASS |
Russ Owen
|
|
|
|
Rough-in | 10/3/2002 | 10/4/2002 | 10/4/2002 | A | PASS |
Russ Owen
|
|
|
###-####
|